A useful partition layout shows more than the cage perimeter. It shows how people, equipment, and building services move through the space.

Measure The Enclosure And Its Surroundings

Start with a plan view showing each partition run, the required enclosure height, and the location of existing walls. Dimension from a consistent reference, such as a finished wall or column face. Identify whether a dimension represents the available room, the outside of the enclosure, or the clear space needed inside. Those are different measurements, and confusing them can change the layout.

Show columns, floor changes, baseboards, pipes, ducts, electrical panels, and overhead obstructions. Add photographs of the installation area, especially where a partition meets the building. For a retrofit or an addition to an existing cage, include close photographs and dimensions of the existing frames, posts, doors, and connections.

Choose The Construction Before Finalizing Details

ProGuard wire mesh partitions use angle-framed panels. MaxGuard wire mesh partitions use channel-framed construction, with Standard Duty and Heavy Duty options. The frame system affects panel connections, supports, and the way the enclosure is detailed. Review the ProGuard and MaxGuard comparison before carrying one system’s details into another.

For an existing installation, send the original drawings or product information if available. A similar-looking mesh opening does not establish that two systems connect. Identify existing conditions when requesting replacement pieces or an extension.

Size Doors For The Movement Through Them

List each door’s required clear opening, location, swing or slide direction, and locking requirement. Consider the largest cart, pallet, machine, or piece of equipment that must pass through. Leave room for the door to operate without blocking an aisle, cabinet, adjacent door, or maintenance access.

State whether the opening needs a padlock arrangement, keyed lock, or a project-specific access-control provision. If a door is part of an exit route, identify that requirement at the start so the project team can coordinate the appropriate hardware and clearances. A nominal door size is not a substitute for the required clear passage.

Specify Mesh, Finish, And Top Closure

Identify the mesh opening, wire size, and welded or woven construction required by the specification. If you are choosing between infills, explain what the enclosure must separate or protect. Visibility, ventilation, the size of stored items, and access through the mesh all affect the choice. Product pages show the available mesh and finish selections.

Describe the environment: conditioned interior, damp service area, exterior exposure, or another condition. Include the finish and color when known. If a mesh ceiling is required, show its extent and the services above and below it. A mesh top is an enclosure component; do not treat it as a walking surface or storage platform.

Resolve Building Connections And Service Openings

Show the floor and adjoining construction where the system will attach. Mark areas where drilling is restricted and note any known requirements for anchors or supports. Keep cutouts for pipes, ducts, and cable routes on the drawing rather than leaving them to be discovered during installation.

Coordinate enclosure height, ceiling panels, and openings with sprinkler coverage, lighting, ventilation, maintenance access, and the building’s requirements. Final support and code decisions belong in the project’s reviewed design. A concept layout helps identify these questions early; it does not replace approved installation or engineering documents.

Send A Quote Package The Shop Can Work From

Send the dimensioned plan, enclosure height, door schedule, mesh and finish requirements, photographs, and any project specification. Include quantity, delivery location, installation scope, access restrictions, and the required schedule. Mark unknown items clearly so NWW can address them during review.

You can start a concept in the ProGuard partition design studio, find literature in the specification and document library, or attach your own drawings to a ProGuard quote request. For MaxGuard or another product, use the general project quote form.

From NWW projects

Enclosures Behind The Scenes At The 9/11 Memorial

Newark Wire Works provided wire mesh caging in the subcellar around the equipment serving the reflecting pools at the 9/11 Memorial at the World Trade Center. This work is part of our experience in museums and cultural facilities, where equipment enclosures serve areas visitors may never see.

For an enclosure around building equipment, show the service access, doors, utilities, and obstructions on the project drawings. Those details help us review how the enclosure will fit the space and how the equipment will remain accessible.

Explore NWW's project experience →