Skip to content
Made in the USA · Since 1910
Newark Wire Works Start a Quote

Made in the USA

Colocation · critical infrastructure · controlled access

Data Center Security Cages

Wire mesh cages for customer equipment, server rows, and restricted service areas. Plan the enclosure around the equipment, access floor, overhead services, and door requirements.

  • Two partition familiesMaxGuard channel frame or ProGuard angle frame
  • Access-ready openingsHinged, paired, or sliding configurations
  • Project-specific closureOpen top, roof-over, or coordinated to structure

Security without hiding the room

Planning A Cage Around The Equipment

A data center cage separates a customer area, cabinet group, or service zone with framed wire mesh and controlled access. We offer ProGuard angle-framed and MaxGuard channel-framed systems. The mesh keeps equipment visible and allows air through, while the frame, support, and access hardware are selected for the facility requirements.

Lay out cabinet rows, working aisles, personnel doors, and the route for moving equipment first. Then review locks, ceilings, raised-floor interfaces, and overhead closures. Cable trays, cooling, sprinklers, grounding, and emergency access involve other building systems, so include the relevant drawings and trade requirements with your cage plan.

The same project, explained for every stakeholder

Start With What You Need To Accomplish

Owner or operator

“I Need To Control Access To This Equipment”

Show us what must be protected, who needs access, how the room operates, and whether the footprint may grow.

Architect or engineer

“I Need A Coordinated, Specifiable Enclosure”

Define system, duty, mesh, height, support, top closure, opening, hardware, finish, performance responsibilities, and governing criteria.

GC or estimator

“I Need A Complete Scope With Fewer Assumptions”

Send plans, elevations, specification, door schedule, access-floor details, finish, logistics, schedule, and installation responsibility.

Superintendent or installer

“I Need The Material To Fit The Actual Room”

Verify dimensions, slab and floor conditions, obstructions, secured side, panel marks, door handing, anchors, overhead services, and working restrictions.

Data center cage planning tool

Organize The Eight Decisions That Shape The First Review

Fill in the details you know and leave undecided items open. Send the summary with your drawings so we can review the remaining questions.

Your project summary

Customer Cabinet Suite

System
MaxGuard Standard Duty
Floor
Concrete slab
Under-floor barrier
No under-floor security barrier
Top
Open top
Opening
Single hinged personnel door
Hardware
Mechanical key or padlock
Expansion
Fixed current footprint
Coordinate before fabrication

Provide the room plan, cage dimensions, equipment, floor condition, under-floor barrier requirements, overhead services, opening schedule, access-control requirements, finish, logistics, and installation scope.

Send plans with this summary

Start with the operating layout

The Cage Should Follow How The Room Is Actually Used

Cabinets, aisles, doors, carts, service clearances, maintenance routes, cooling strategy, and expansion matter as much as the outside dimensions.

01

Private Customer Suite

A complete perimeter around a customer-controlled cabinet group, normally with dedicated personnel access and optional larger equipment access.

ShowCabinets, hot and cold aisles, clearances, door approach, locks, ceiling condition, and demarcation.
02

Row Or Aisle Separation

A long partition or narrow enclosure separating equipment rows, circulation, or one operational zone from another.

ShowRun length, corners, intersections, equipment doors, carts, removable panels, and end conditions.
03

Equipment Protection Enclosure

A focused cage around network, electrical, UPS, battery, controls, or building-service equipment.

ShowRequired working clearances, heat, service doors, controls, labels, conduits, and maintenance access.
04

Phased Or Expandable Cage

A first-stage footprint organized so panels, openings, and future runs can change as equipment is installed.

ShowCurrent phase, future limits, removable sections, planned joints, added doors, and uninterrupted services.

Choose the partition family after the requirements are visible

MaxGuard And ProGuard Solve The Enclosure Differently

Both can form complete data center enclosures. The written specification, duty, mesh, panel appearance, height, support, openings, and hardware determine the better starting point.

Channel frame

MaxGuard Standard Duty

Channel-framed panels with standard 10-gauge, 1½-inch diamond woven wire for controlled-access enclosures.

  • Protected mesh edges within the channel frame
  • Hinged doors and sliding-gate configurations
  • Direct, floor-shoe, or tube-supported layouts as approved
Explore MaxGuard →
Heavy channel frame

MaxGuard Heavy Duty

Larger channel framing with standard 6-gauge, 2-inch diamond woven wire. Review the frame, support, and hardware against the facility specification.

  • Heavy Duty framing and project-specific tube support
  • Heavier door and gate coordination
  • Complete anchorage and structural review required
Review Heavy Duty →
Angle frame

ProGuard Standard Duty

Angle-framed panels with welded, woven, expanded-metal, and other infill choices.

  • 2-inch-square welded wire standard starting point
  • Alternative welded, woven, expanded, and sheet infills
  • Custom openings, doors, gates, ceilings, and finishes
Explore ProGuard →

Do not select solely from appearance: Confirm the complete security requirement, specification, compatible mesh and frame, support condition, doors, hardware, finish, and approved project documents.

Finishes & Colors

Choose your paint color or compare the coating options for your project.

Painted Enamel

Electrostatically applied, air-dried enamel. Battleship Gray and Jet Black are our standard painted colors; include your preferred color with your quote request.

Battleship Gray
Jet Black
Safety Blue
Safety Yellow
Safety Orange

Need a specific paint color? Send the color reference or project specification with your plans.

Additional Finish Options

Powder coating color reference

Powder Coating

Polyester powder coating in a project-selected color. Send the color code or approved sample and any specified coating requirements.

Hot-dip galvanized steel finish sample

Hot-Dip Galvanizing

A zinc coating for compatible carbon-steel construction. Review this option for outdoor, damp, or other exposure conditions called out in the project specification.

Galvanizing + Powder Coating

Hot-dip galvanized steel with a powder-coated color finish. Specify both coatings so we can review the preparation, color, and complete finish system.

Color samples are illustrative. Confirm the final color and finish with an approved sample. Coating suitability depends on the selected material and construction; ask us about stainless steel, aluminum, or mill-galvanized and unpainted mesh.

Data center coordination map

Resolve The Interfaces Before They Become Field Conflicts

This is the information NWW needs to coordinate the cage package. The responsible project teams retain design authority for their systems.

InterfaceWhat NWW needs to seeWho normally confirms it
Raised access floorFloor manufacturer, 24 × 24-in. tile and pedestal layout, stringers, elevations, underfloor services, slab, approved support or anchorage detail, and framed or unframed crawl-under barrier direction. Each under-floor security panel covers one tile bay; no panel spans multiple bays.Owner, architect, structural engineer, access-floor contractor
Cooling and airflowHot/cold aisle strategy, supply and return paths, containment, equipment intake/discharge, required free area, and any pressure criteriaOwner, mechanical engineer, equipment provider
Overhead servicesClear height, beams, deck, cable tray, busway, piping, ducts, lighting, sprinklers, detectors, cameras, and maintenance accessArchitect and affected trades
Fire protectionSprinkler coverage, obstruction review, clearances, access, detection, suppression, and top-closure requirementsFire-protection engineer/contractor and AHJ
Doors and egressOpening numbers, clear widths, handing, swing/travel, approach, closers, panic hardware, emergency operation, and path of egressArchitect, code consultant, owner, AHJ
Access controlLock type, reader location, power, wiring, contacts, request-to-exit, monitoring, fire-alarm interface, and fail-safe/fail-secure sequenceSecurity, electrical, fire-alarm, and access-control teams
Structure and anchorsSubstrates, reinforcing, post-tensioning, allowable drilling, base conditions, loads, post spacing, lateral support, and approved anchorsStructural engineer and contractor
Installation logisticsSecure access, badging, escorts, work hours, shutdowns, material route, freight elevator, staging, dust/noise limits, and protectionOwner, GC, facility manager, installer

Doors, gates, and access control

Design The Opening Around Everyday Operation And Emergency Requirements

The door is where the wire partition, users, hardware, electrical power, controls, monitoring, fire alarm, and egress strategy meet.

Wire mesh security cage with sliding gate and access-control hardware

Personnel Access

Single or paired hinged doors coordinated for clear opening, handing, swing, closer, credentials, and egress.

Equipment Access

Double doors or overhead-track sliding gates sized around cabinets, carts, replacement equipment, and the available approach.

Mechanical Hardware

Padlock, keyed mortise or lever hardware, interchangeable core, panic hardware, and door-closer options.

Electronic Access

Electric strikes, electromagnetic locks, readers, contacts, monitoring, power transfer, request-to-exit, and controls coordination.

Access-control sequence to document
  1. Normal entry and credential
  2. Normal exit and request-to-exit
  3. Power-loss condition
  4. Fire-alarm or emergency condition
  5. Monitoring and forced/held-open status
  6. Manual override and owner keying

Installation visibility

Understand The Connections Before The Material Enters A Secure Facility

These MaxGuard details illustrate common connection concepts. The approved project drawings, component schedule, substrate information, system selection, and field conditions control the installation.

  1. 01Verify the room

    Confirm dimensions, equipment, access floor, slab, walls, columns, overhead services, secured side, openings, and expansion limits.

  2. 02Coordinate support

    Resolve posts, floor shoes, wall connections, access-floor interfaces, anchors, lateral support, capping, and ceiling members.

  3. 03Sequence secure access

    Plan badging, escorts, staging, work hours, drilling controls, shutdowns, debris containment, and protected routes.

  4. 04Install and align

    Follow panel marks, maintain plumb and line, install approved fasteners and anchors, then align openings before final tightening.

  5. 05Complete hardware

    Install doors, gates, locks, closers, contacts, strikes or magnets, guides, stops, and trade-provided access-control components.

  6. 06Test and turn over

    Check anchors, joints, clear openings, travel, latching, egress operation, monitoring, controls, labels, and owner documentation.

Data center quote checklist

A Marked-Up Plan Is More Valuable Than A Perfect Description

Send what you have. Newark Wire Works can identify which dimensions, details, or decisions are still needed before the enclosure is priced or fabricated.

Start a data center cage quote
  • Plan and elevationsRuns, corners, overall height, top condition, walls, columns, and obstructions
  • Equipment and aislesCabinets, clearances, carts, service routes, airflow arrangement, and future equipment
  • Floor informationSlab, access-floor manufacturer, 24 × 24-in. tile grid, pedestals, stringers, utilities, support detail, and framed, unframed, or no under-floor barrier. Every selected under-floor security panel covers one tile bay; no panel spans multiple bays.
  • Overhead coordinationDeck, beams, cable tray, busway, ducts, pipes, sprinklers, lighting, cameras, and clearances
  • OpeningsDoor or gate numbers, clear size, handing, swing/travel, approach, equipment route, and egress
  • Access controlHardware, keying, readers, power, contacts, REX, monitoring, alarm interface, and sequence
  • System and finishSpecification, ProGuard or MaxGuard, duty, mesh, color, coating, and environment
  • Logistics and scheduleLocation, floor, security, work hours, staging, delivery, installation, bid date, and required completion

Data center cage FAQs

Answers For The First Project Conversation

These answers describe the planning process. Approved project documents and the responsible design teams control the final requirements.

What is a data center security cage?

A data center security cage is a visible wire mesh enclosure used to separate customer equipment, network hardware, electrical equipment, service areas, or other controlled spaces within a data center. The complete layout can include wall panels, posts, hinged doors, sliding gates, locks, access-control hardware, and an optional mesh ceiling.

Which Newark Wire Works system is best for a data center cage?

MaxGuard is the channel-framed system and is available in Standard Duty and Heavy Duty construction. ProGuard is the angle-framed system and offers a broad range of mesh and infill choices. The best starting point depends on the written specification, required security, appearance, height, openings, support conditions, and future expansion plan.

Can the cage be installed on a raised access floor?

Yes, when the complete support and anchorage approach is coordinated with the access-floor system and building structure. Floor panels alone should not be assumed to provide an acceptable structural attachment. When a crawl-under security barrier is required, choose framed or unframed wire mesh panels. Each under-floor security panel covers one 24 × 24-inch raised-floor tile bay, and no panel spans multiple tile bays. Provide the access-floor manufacturer, tile layout, pedestal and stringer information, underfloor utilities, slab information, and any approved support detail.

Can a data center cage have a wire mesh ceiling?

Yes. Framed wire mesh ceiling panels and supporting members can close the top when required. The enclosure width, panel span, structural support, cable trays, busway, piping, ducts, lighting, sprinklers, clearances, and service access must be reviewed before fabrication.

Will wire mesh block cooling airflow?

Open wire mesh preserves far more free area than a solid wall, but Newark Wire Works does not design the data center cooling system. The owner and mechanical design team must confirm hot-aisle and cold-aisle strategy, equipment intake and discharge paths, containment, pressure relationships, and required free area.

Which access-control hardware can be used?

Available options include padlock hasps, keyed mechanical locks, Marks mortise locksets, cylindrical lever locks, electric strikes, electromagnetic locks, panic hardware, door closers, monitoring contacts, and card-reader requirements. The responsible design team must confirm egress, fail-safe or fail-secure operation, fire-alarm interface, power, controls, and sequence of operation.

Can cages be designed for future expansion?

Yes. A phased or expandable layout can reserve panel joints, removable sections, future runs, additional doors, or an enlarged footprint. Show the current and planned equipment arrangement so the first installation does not block the intended expansion path.

What information is needed for a data center cage quote?

Send a plan or marked-up sketch showing overall runs, height, doors or gates, handing, clear openings, lock and access-control requirements, raised-floor tile and pedestal layout, slab conditions, framed, unframed, or no under-floor security barrier, top closure, overhead obstructions, finish, project location, delivery restrictions, schedule, and installation responsibility. When an under-floor barrier is required, each panel covers one 24 × 24-inch tile bay and no panel spans multiple bays.

Does Newark Wire Works provide installation?

Newark Wire Works can review material-only and installed-project scopes. Installation availability and responsibility are confirmed for the project location, schedule, access restrictions, working hours, security procedures, and site conditions.

Who confirms fire protection, egress, electrical, and structural requirements?

The architect, engineers, owner, contractor, access-control team, fire-protection team, and authority having jurisdiction confirm their respective design and code requirements. Newark Wire Works coordinates the wire partition package to the approved project documents and confirmed field information.

Ready for a coordinated review?

Send The Room Plan, Cage Limits, Floor Condition, Overhead Services, Openings, And Access-Control Requirements

Newark Wire Works will help organize the enclosure scope around the information available and identify the remaining decisions.

Installation drawing